The main uplink switch will be replaced with a hot-spare on Saturday, December 8th at 2 AM EST (-0500 GMT). All servers will lose connectivity temporarily for 5 – 10 minutes as the new switch is installed and ports reconnected.
Network Maintenance on Saturday at 2 AM